少妇乱子伦在线播放,中文字幕在线视频免费观看,国产成人精品日本亚洲直播一,婷婷六月丁,双程2电视剧全集完整版在线观看,亚洲成人日韩,亚洲免费福利

CN
  • 24-hour global service hotline+86-0592-5616400 13906049004

HJX-ADRV9029-SDR

HJX-ADRV9029-SDR

  With the further development of massive MIMO applications, it brings a greater challenging requirement for power consumption, inter-channel matching and isolation of the system.

  ADRV9029 is the fourth generation broadband RF transceiver of ADI. It adopts the latest 28nm process. Compared with the previous generation product (ADRV9009), it improves the integration twice under the same power consumption, then improves the radiodensity to support more antennas. At the same time, it also improves the isolation of chip ports.

  ADRV9029 supports frequency division duplex (FDD) and time division duplex (TDD) standards, which can help simplify the design of 3G / 4G / 5G applications while reducing system power, size, weight and cost.

  ADRV9029 can be used to support base station applications, including single standard and multi standard 3G / 4G / 5G macro cell base stations, large-scale MIMO (M-MIMO) and small cell systems.

  ADRV9029 is the DFE version of ADRV9026, DPD and CFR functions are integrated inside. In the application of wireless base station, 4 channels can save about 7W power consumption for FPGA and also save a lot of FPGA resources.

  As a partner of ADI, Xiamen Hejiaxing (HJX) have launched HJX-ADRV9029-SDR in combination with RadioVerseTM technology, which will help customers develop systems with more powerful features and functions than before.


Product Details

1、HJX-ADRV9029-SDR SYSTEM DIAGRAM DESCRIPTION

9026sysBlock.png

  HJX-ADRV9029-SDR is highly customizable. It can provide wide bandwidth and tuning range for various applications. It includes one ADRV9029 Quad-channel transceiver and one Xilinx Zynq Ultrascale plus MPSOC XCZU11EG. It makes the whole platform obtain powerful data processing ability. Meanwhile, it has a 1GB DDR4 equipped for SoC programming system and has a 512MB DDR4 equipped for SOC programming logic part. It provides great flexibility for the development of custom applications. Besides, it provides 32GB EMMC flash memory for data storage and a Nor Flash 64MB as user flash, and also reserves additional options to start the system via SD card.

  For the clock circuit of HJX-ADRV9029-SDR, it select AD9545 as the main clock chip, plus a clock buffer to expand the number of clock channels. Please kindly note that AD954S series chips support synchronous source input, such as GPS second pulse, IEEE1588, etc.

  RF front end of HJX-ADRV9029-SDR provides hardware support for ADRV9029 RX QEC, TX QEC and LO Leakage calibration.At the same time, this board provides front LNA to ensure better receiver performance, and also provides a gain block at the transmitter to ensure high output signal power. And since ADRV9029 does not support external LO function yet, only hardware is reserved for internal and external LO circuits on the board. Since the ADRV9029 chip reserved an external LO input pin ( but API does not support the external Lo function at this stage), HJX-ADRV9029-SDR also reserves the hardware circuit of external LO. If in the future the API of ADI can support the function of external LO, the user can develop this part of function by himself.

  HJX-ADRV9029-SDR has a wide range of I / O functions and can use various high-speed I / O, including QSFP, TF card, USB2.0, Gigabit Ethernet, power switch, Mini USB downloader and debug port. A 40G QSFP interface was reserved on the hardware board for the customer to further develop high-speed transmission interface for data transportation in the future. Besides, 36 channel- GPIO pins are introduced from HD Bank of FPGA for communication with external modules. Xilinx FPGA Downloader is also integrated, which can easily realize FPGA program download and serial port communication.

  HJX-ADRV9029-SDR’s circuit design idea and programming logic makes it easy for customers to evaluate and design. Then it is integrated into the customized carrier seamlessly for further prototype design and shortening the time to market of the final product.


2、HJX-ADRV9029-SDR SYSTEM TECHNICAL SPECIFICATIONS

SpecificationsTyp. values
Frequency tuning range75MHz ~ 6GHz 
Max RX bandwidth200MHz
Max TX bandwidth450MHz
Max ORX bandwidth450MHz
Operation modeTDD/FDD
ADC/DAC accuracy16bit/14bit
Dimension184mm*255mm
Working voltage12V
RF Interface typeMCX

4xTX ports

4xRX ports

4xORX ports

Reference clock input

Trigger input

PPS input

Note: Select the corresponding balun model according to different application frequency bands. The balun sealed package is 0805. The default balun model of the board is HHM1525.


3、HJX-ADRV9029-SDR INTERFACE SPECIFICATION

a)         Inputreceiver: MCX-KE(4pcs);

b)        Output ( transmitter): MCX-KE(4pcs);

c)         Feedback channel (receiver): MCX-KE(4pcs);

d)        External clock input interface: MCX-KE(1pc);

e)         External LO input interface: MCX-KE2pcs, reserved;

f)         Gigabit network port: RJ451pc;

g)        SD card connector: Micro SD1pc;

h)        100G Optical module interface: QSFP(1pc;

i)          USB-UART interface port &JTAG interface port: Mini-USB1pc;

j)          Power supply port: VH3.96mm 2pin1pc;

k)        PHD2.0 connector: 2X10PIN2pcs


4、HJX-ADRV9029-SDR TEST DATA

4.1. In-band harmonics

Test condition: Single tone signal mode.The signal is provided by the signal source and output to the spectrum analyzer after passing through the HJX-ADRV9026-SDR development board to observe the spectrum, as shown in the figure below.

帶內(nèi)雜散.png


4.2. Frequency response

9026頻率響應.png


4.3. Phase noise test

9026相位噪聲.png


4.4.Time delay

Test conditions: CDMA pilot signal mode, signal source input power is -35dbm, after HJX-ADRV9026-SDR development board, output to spectrum analyzer, the total delay tested is 1.38us (including test system delay 0.36us).

9026時延.png


4.5.ACPR

Test conditions: HJX-ADRV9026-SDR setting conditions, RX local oscillator is set to 2595MHz, TX local oscillator is set to 2595MHz, TX attenuation value is 10dB.Fdd-lte signal mode, the input frequency is set to 2595MHZ, and the input power of signal source is -32.5dbm. After hJX-ADRV9026-SDR development board, the output power to the spectrometer is -3.3dbm.

9026ACPR.png

For more test data, please contact HeJiaXing regional sales manager.


5、HJX-ADRV9029-SDR SYSTEM EVALUATION DIAGRAM

HJX-ADRV9029-SDR系統(tǒng)評估圖.jpg


l  Test Case 1 : Huatai PA.

The following figure shows the comparison data before and after ACPR correction

9029-華太dpd校準.png


l  Test case2: Puneng brand PA.

ACPR

9029-普能dpd校準.png


    EVMEVM.png


6、HJX-ADRV9026-SDR APPLICATION SCENE

?3G/4G/5G macro cell base stations

?TDD active antenna systems

?Massive MIMO


7、CONTACT INFORMATION

For more information or to order products, please contact Xiamen Hejiaxing Sales Office.

Mobile phone: 13600975566(same wechat number)

QQ: 2355620732

Email: zf@hjx.cn





隆化县| 西青区| 双城市| 襄汾县| 威海市| 高雄县| 温州市| 防城港市| 浑源县| 连城县| 河南省| 莱阳市| 四平市| 天峻县| 潍坊市| 石城县| 水富县| 百色市| 突泉县| 顺平县| 柞水县| 聊城市| 阳曲县| 宜宾市| 定陶县| 西宁市| 九台市| 东源县| 库伦旗| 永善县| 新田县| 九江县| 酉阳| 大悟县| 浪卡子县| 葫芦岛市| 枣阳市| 湟中县| 建始县| 湖口县| 苏尼特左旗|